Mernda Junction under construction

Much of the ground floor slab is poured with the upper level and ramps quickly following. Both levels of the slabs should be complete within a month. The majority of the precast panels are up now including the majority of the suspended panels.

The under croft insulation and services are starting to be installed on the lower level to the East of the site under Coles. The Coles loading dock is set up for further works.

Much of the steel is up for the Coles and the Mall now and the roof has started being constructed.

The services remain to continue in the under croft with much of the lighting, mechanical units  and fire services all working around each other.

 

Project Name: Mernda Junction Shopping Centre

Client: MJSC

Builder: Hacer

Cost: $35m

Location: Mernda Junction

Status: Construction