Cuballing
Manufacturing plant
The Patmore Feed project at Cuballing WA is part ongoing commitment by the client to design develop and supply the material handling on regional production facilities across Australia.
LOCATION
Wiilman Country | Cuballing WA
SIZE
15.5ha
CLIENT
LGPM, Patmore Feeds
YEAR
2021
STATUS
Construction
The feed mill facility is over five stories and five independent buildings connected with an extensive network of both dry and wet goods transport. From the weighbridge to the intake shed and through the processing facility to distribution and warehousing Cuballing is able to mill 30+ tons an hour, from a seven silo 2300t supply and store over 1000t in ten silos at the independent out loading.
These areas are expandable for the production or transport of dry goods as well as palletisation and issue of bulk feed bags, this is done through the warehouse. Once commissioned will be primarily for the production of stock feeds and be supplying key sectors including beef production.
SITE DETAILS
Facility type: Feed production
Milling capacity: 30 tons per hour
Bulk ingredient capacity: 2600 – 2800 tons
Bulk out-loading dispatch capacity; 1000 tons
Site area; 15.5 ha
Combined building area (GLA): 4250m2
Awning area: 225m2
EXTERNAL AREAS
Heavy duty concrete handstand: 7500m2
Light duty asphalt carpark: 750m2
Car park: 16 spaces